Site 1-Outfall which is upstream of the intake by a few meters
Site 1-Outfall
Site 1-Intake, downstream of outfall, pipe covered by meshing to prevent debris entering
Site 1-Intake, pipe encased in mesh
Site 1-Building which is cooled by the canal
Site 1-Pumps, 1 large and 2 small
Site 1-Pumps
Site 1-Boiler room
Site 1-Heat exchange plates
Site 1-Chiller controls
Site 1-Chiller
Site 2-Intake and outfall on top of one another
Site 2-Building which is cooled
Site 2-Heat exchange plates
Site 2-Control room and chillers
Site 3-Heat exchange plates
Site 3-Control room
Site 3-Outfall
Site 3-Intake just before bridge
Site 3-Intake just downstream of barrier
Site 3-Intake and outfall about 30m apart
Site 3-Building 1 which is cooled using this system
Site 3-Building 2 which is cooled using this system